CleanSpark Inc. has announced the completion of phase two of its mining campus expansion in Washington, Georgia. The expansion is expected to increase CleanSpark's bitcoin mining compute power by 1.8 exahashes per second (EH/s) to a total of 8.5 EH/s. The company has set lofty goals of reaching a target of 16 EH/s by the end of the year. The Washington campus has a power capacity of 50 megawatts (MW) and currently operates over 10,500 mining machines, with a total investment of over $100 million.
Zach Bradford, CEO of CleanSpark, expressed his appreciation for the successful execution of the expansion, highlighting the technical expertise and support from the local community. He stated, "This expansion has already helped us get more than halfway to our year-end guidance of 16 EH/s."
CleanSpark has been actively pursuing growth opportunities, particularly during the recent bear cycle. Last month, the company acquired a turnkey bitcoin mining campus in Dalton, Georgia, consisting of two sites, for $9.3 million. In addition to that, in the same month the company announced the acquisition of more than 12,000 cutting edge mining machines.
The expansion in Washington, Georgia, has marked another milestone for CleanSpark as it continues to increase its bitcoin mining capacity.
Your account isn't verified. An email has been sent to the address you specified
on registration with an activation link. Please check your inbox (and also your spam box)
and follow the instructions in our message. If the mail doesn't arrive after several
attempts, please request support to the website staff.
The password doesn't match with the one registered for this account.
Sorry, but you can't login at this time. Please try again later.
The device you're connecting from is disabled.
Your IP address isn't allowed to login on this account. Please check your email for further actions.
Sorry, but the verification code must be numeric and should be six digits.
2FA verification failed. Please try again. If the problem persists, please contact our tech support staff.
Sorry, but your IP address has been blocked due to excess of login attempts.
If you think this is an error, please send us an email to admin@growbot.club.
We will reply as soon as possible.
Login attempt failed.
WARNING: you have one last attempt to login.
Your IP address will be blocked after the next failed attempt.
Host blocked: ec2-18-189-170-65.us-east-2.compute.amazonaws.com
Sorry, but your gateway or host is blocked here.
If you think this is an error, please send us an email to admin@growbot.club.
We will reply as soon as possible.
IP blocked: 18.189.170.65
Sorry, but your IP address is blocked here.
This may be caused by an excess of failed login attempts or
an administrator that has detected a bruteforce attack from your IP.
If you think this is an error, please send us an email to admin@growbot.club.
We will reply as soon as possible.
Country blocked: United States
Sorry, but your country is blocked here.
If you think this is an error, please send us an email to admin@growbot.club.
We will reply as soon as possible.
This device is not registered. An email has been sent to your address with a token to authorize this device permanently.
Please check your email(s) for a token to reset your password. Don't forget to check your spambox!
0
Media gallery browser
Sorry, but the item type you selected isn't currently supported. It can't be inserted.
We use cookies to enhance your browsing experience, serve personalized ads or content, and analyze our traffic.
By clicking "Accept All" you consent to our use of cookies, which are protected under the terms of our Privacy Policy.
Preferences are stored in your browser for 60 days, and you can remove them at any time.